Diablo Canyon Independent Safety Committee
B. DCISC Public Meeting Notices, Agendas and Reports
- B.1 Notice of Notice of October 18 & 19, 2006 Public Meetings
- B.2 Agenda for October 18 & 19, 2006 Public Meetings
- B.3 Minutes of October 18 & 19, 2006 2005 Public Meetings
- B.4 Notice of January 31 & February 1, 2007 Public Meetings
- B.5 Agenda for January 31 & February 1, 2007 Public Meetings
- B.6 Minutes of January 31 & February 1, 2007 Public Meetings
- B.7 Notice of June 13 & 14, 2007 Public Meetings
- B.8 Agenda for June 13 & 14, 2007 Public Meetings
- B.9 Minutes of June 13 & 14, 2007 Public Meetings
- B.10 Typical DCISC Service Mailing List
- 1.0 PG&E/DCPP Organization
- 2.0 Summary of Diablo Canyon Operations
- 2.0.1 Operating Capacity Factor
- 2.0.2 Refueling Outages
- 2.0.3 Collective Radiation Dose Equivalent Exposure
- 2.0.4 Industrial Safety Lost Time Accident Rate
- 2.0.5 Unplanned Reactor Trips
- 2.0.6 Unplanned Safety System Actuations
- 2.0.7 Secondary Chemistry Index (SCI)
- 2.0.8 Fuel Reliability
- 2.1 Employee Concerns Program
- 2.2 Fitness for Duty
D. DCISC Reports on Fact-finding Meetings
- 1.0 Summary
- 2.0 Introduction
- 3.0 Discussion
- 3.1 Review 1st and 2nd Quarter 2006 QPAR
- 3.2 Update on Outage Safety Plan
- 3.3 ALARA Overview
- 3.4 Review Status of Self-Assessment Program
- 3.5 Engineering Workload Management Status for Project Engineering
- 3.6 Review Employee Concerns & Differing Professional Opinion Programs
- 3.7 Review System Health Reports in Red or Yellow with ICE System Engineering Supervisor
- 3.8 Tour of Intake Structure Including Concrete Work Performed During 1R13 and 2R13
- 3.9 DCISC Member Meet with Plant Management
- 3.10 NEXIS Project Overview
- 3.11 Attend Plant Health Meeting
- 4.0 Conclusions
- 5.0 Recommendations
- 6.0 References
- 1.0 Summary
- 2.0 Introduction
- 3.0 Discussion
- 3.1 12kV System Review with System Engineer D.2-2
- 3.2 Transmission Grid Reliability D.2-4
- 3.3 Reactivity Management D.2-5
- 3.4 INPO Mid-Cycle Self-Assessment D.2-8
- 3.5 Boric Acid Corrosion Control D.2-9
- 3.6 4kV System Cable Degradation & Replacement D.2-11
- 3.7 Long Standing Equipment Problems & Attend D.2-12 Plant Health Committee Meeting
- 3.8 Safety Culture and Safety Conscious Work Environment D.2-14
- 3.9 Equipment Qualification Program D.2-16
- 3.10 Corrective Action Program D.2-17
- 3.11 Quality Verification Audit of the Software QA Program
- 3.12 Vendor Manual Program
- 3.13 Unit 2 Reactor Vessel In-Core Instrumentation Thimble Tube Rupture
- 3.14 DCISC Member Meeting with DCPP Management
- 4.0 Conclusions
- 5.0 Recommendations
- 6.0 References
- 1.0 Summary
- 2.0 Introduction
- 3.0 Discussion
- 3.1 Quality Verification (QV) Assessments of Corrective Action Program
- 3.2 Large Electric Motor Program
- 3.3 Meet with New Maintenance Services Director
- 3.4 Air Operated Valve Program
- 3.5 Margin Management Program
- 3.6 Trends, Actions on NRC Non-cited Violations
- 3.7 NRC Information Notice 2005-29 Electrical Distribution System Failures Affecting Security Equipment
- 3.8
EDG System Update & Lessons-Learned from Brunswick Operating Experience Leadership Development for Senior Management Team
- 3.9 Auxiliary Saltwater System Review & Walkdown with System Engineer
- 3.10 Observe Operator Training on Plant Simulator
- 3.11 Operator Fitness & No Solo Trends
- 3.12 DCISC Member Meeting with Plant Management Observations Program and New Management Ownership
- 4.0 Conclusions
- 5.0 Recommendations
- 6.0 References
- 1.0 Summary
- 2.0 Introduction
- 3.0 Discussion
- 3.1 Security Items Update & Review
- 3.2 ALARA Review Committee and Outage 1R13 Radiation Protection Performance
- 3.3 Meeting with New NRC Resident Inspector
- 3.4 Nuclear Fuel Overview & Issues
- 3.5 Ten-Year In-Service Inspection for Outage 1R13
- 3.6 Tour of Plant During Outage 1R13
- 3.7 Measuring & Test Equipment Program Review
- 3.8 Recent EPA Emissions Requirements for Diesel Engines and Impact on DCPP
- 4.0 Conclusions
- 5.0 Recommendations
- 6.0 References
- 1.0 Summary
- 2.0 Introduction
- 3.0 Discussion
- 3.1 Attend NSOC Meeting
- 3.2 Status of the Emergency Diesel Generator System and System Walkdown
- 3.3 Results of Steam Generator Inspection in 1R13
- 3.4 Results of 1R13 Outage
- 3.5 DCISC Member Meeting with DCPP Management
- 4.0 Conclusions
- 5.0 Recommendations
- 6.0 References
- 1.0 Summary
- 2.0 Introduction
- 3.0 Discussion
- 3.1 Human Performance Overview
- 3.2 INPO Evaluation and DCPP Response and Action
- 3.3 Status of Organizational Development at DCPP
- 3.4 Overview of DCPP Culture as a Learning Organization
- 3.5 Human Resources Update
- 3.6 Operating Experience Assessment Program
- 3.7 Quality Verification Update
- 3.8 Meeting with VP Nuclear Services Donna Jacobs
- 3.9 Compressed Air & Backup Nitrogen Systems Review and Walkdown with System Engineer
- 3.10 Nuclear Excellence Information System (NEXIS) Project Review
- 4.0 Conclusions
- 5.0 Recommendations
- 6.0 References
- 1.0 Summary
- 2.0 Introduction
- 3.0 Discussion
- 3.1 Rigging Problems during 1R13
- 3.2 Review 1R13 Core Reload Incorrect Sequencing
- 3.3 Review Plant Process Computer Red Status Recovery
- 3.4 Tour 230 and 500 kV Switchyard and Discuss Operations Of Transmission Lines, Including Loss of 230kV Power During 1R13 Relay Testing
- 3.5 Review 1R13 Reactor Coolant Pump 1-2 Work and Status of Industry Issue on Shaft Cracking
- 3.6 Equipment Reliability Status
- 3.7 Review Progress Made in Troubleshooting Program
- 3.8 As-Built Drawings
- 3.9 Attend All Hands Meeting
- 3.10 Review Status of Auxiliary Salt Water System
- 3.11 DCISC Member Meeting with Plant Management
- 3.12 Review DCPP Winter Storm Experience
- 4.0 Conclusions
- 5.0 Recommendations
- 6.0 References
- 1.0 Summary
- 2.0 Introduction
- 3.0 Discussion
- 3.1 Joint PNAC/NSOC Meeting
- 3.2 2005 Triennial Fire Protection Audit
- 3.3 Fire Protection System Review with System Engineer
- 3.4 Appendix R (Fire Protection) Program
- 3.5 Switchyard Self-Assessment
- 3.6 Check Valve Program
- 3.7 Clearance Process
- 3.8 DCISC Member Meeting with DCPP Management
- 4.0 Conclusions
- 5.0 Recommendations
- 6.0 References
- 1.0 Summary
- 2.0 Introduction
- 3.0 Discussion
- 3.1 Outage 2R13 Plant Tour
- 3.2 Review First Quarter QPAR and QV Assessment of 2R13 Outage to Date
- 3.3 Attend CARB Meeting
- 3.4 Attend Outage Meeting
- 3.5 Review Chemical & Volume Control System
- 3.6 DCISC Member Meeting with DCPP Management
- 3.8 Review AMSAC Status
- 4.0 Conclusions
- 5.0 Recommendations
- 6.0 References
- G.1 DCISC Telephone/Correspondence Log
- G.2 DCISC Correspondence
- G.3 Comments Received at Public Meetings