Report on Fact-finding Meeting by Diablo Canyon Independent Safety Committee (DCISC) at Diablo Canyon Power Plant (DCPP) on January 17 & 18, 2008 by William F. Conway, Member and R. Ferman Wardell, Consultant [18th Annual Report, Exhibit D.6]

1.0 Summary

The results of the November 13-14, 2007 Fact-finding Trip to the Diablo Canyon Power Plant in Avila Beach, CA are presented. The subjects addressed and summarized in Section 3 include:

  1. Security Safeguards Information (SGI) Qualification
  2. Security Update
  3. New Clearance Process eSOMS
  4. Meet with NRC Resident and Senior Resident Inspectors
  5. Observe Nuclear Safety Oversight Committee (NSOC) Meeting
  6. DCISC Member Meeting with DCPP Management

2.0 Introduction

This Fact-finding Trip to the DCPP was made to evaluate specific safety matters for the DCISC. The objective of the evaluation was to determine if PG&E’s performance is appropriate and whether any areas revealed observations which are important enough to warrant further review, follow-up, or presentation at a public meeting. These safety matters include follow-up and/or continuing review efforts by the Committee, as well as those identified as a result of reviews of various safety-related documents.

Section 4 – Conclusions highlights the conclusions of the Fact-finding Team based on items reported in Section 3 – Discussion. These highlights also include the team’s suggested follow-up items for the DCISC, such as scheduling future Fact-finding meetings on the topic, presentations at future public meetings, and requests for future updates or information from DCPP on specific areas of interest, etc.

Section 5 – Recommendations lists specific recommendations to PG&E proposed by the Fact-finding Team. These recommendations will be considered by the DCISC. After review and approval by the DCISC, the Fact-finding Report, including its recommendations, is provided to PG&E. The Fact-finding Report will also appear in the DCISC Annual Report.

3.0 Discussion

3.1 Security Safeguards Information (SGI) Qualifications

One DCISC Member and one Consultant are allowed DCPP SGI clearance to review DCPP Security (see Item 3.2 Security Update). Member Conway and Consultant Wardell received computer-based training and testing for their initial and re-qualification for SGI, respectively, in order to become eligible for accessing DCPP Security Safeguards Information (SGI). Both candidates qualified and were awarded SGI certification.

3.2 DCPP Security Update

[Note: due to the sensitivity of nuclear plant security, information classified as “Safeguards Information” cannot be presented in this report, thus limiting the breadth and scope of the report. Both Mr. Conway and Mr. Wardell have been cleared for access to DCPP Safeguards Information.]

The DCISC Fact-finding Team met with Bob Zimkowski, Manager of Security; Shawn Dienhart, Security Systems & Training Supervisor; and Jim Graf, Security Programs Supervisor & Security Performance Improvement Coordinator (PICO), for an update of DCPP Security. The DCISC last reviewed DCPP Security at the May 30-31, 2007 Fact-finding Meeting (Reference 6.1) and the June 13-14, 2007 Public Meeting (Reference 6.2). From the May Fact-finding Meeting the DCISC concluded the following:

DCPP Security appears to be effectively meeting plant and NRC requirements. As in previous reviews, the DCISC concludes that the plant activities related to plant security are properly reviewed for potential safety impacts, and that current plant security measures do not have any significant adverse impact on plant safety.

and

DCPP has responded appropriately and acceptably to NRC’s June 20, 2006 Security Order Section B.5.b (loss of large areas of the plant due to fires or explosions). All equipment and procedure changes and related training will be completed by December 31, 2007. All procedure and design changes will be reviewed using standard plant change procedures to assure that the changes have no significant adverse impact on plant safety. The DCISC should follow up to review the implementation in early 2008.

There were three NRC inspections of DCPP Security in 2007. The inspections included the following:

The inspections resulted in two Green (very low safety significance) non-cited violations, neither of which jeopardized physical security or health and safety of the public.

DCPP Quality Verification performed the following Security audits/assessments in 2007:

The audits and assessment concluded that the DCPP Security Plan met NRC regulations and were effectively implemented. The Third Quarter 2007 QV Quality Performance Assessment Report (QPAR) reported that “. . . the DCPP Security Plan, including the Training and Qualification and Contingency Plans and the Protective Strategy, meet NRC regulations and orders and are effectively implemented.” The report noted several minor infractions.

Security performed a self-assessment on its Material Handling and Search Processes. Several procedure changes were recommended and initiated.

DCPP Security performed all required drills with satisfactory results.

DCPP Security achieved significant performance improvements in 2007 in the areas of personnel safety (its best year with one Recordable Injury) and human performance (75% reduction in human errors). Much of the improvement is attributed to effective use of error prevention tools and tight procedure adherence.

The Fact-finding Team reviewed with DCPP Security a recent incident at the Peach Bottom Nuclear Plant in which security guards were found inattentive on duty. DCPP described a number of differences in its organization, schedules, and processes which they have undertaken to avoid similar events.

As reported in the DCPP May 30-31, 2007 Fact-finding Report (Reference 6.1), DCPP was implementing NRC’s Extensive Damage Mitigation Guidelines (EDMGs) and training for Security for beyond-design-basis fire and explosion damage. The EDMG training, procedures, and additional equipment procurement have been completed. The DCISC should review these items in a future Fact-finding meeting in 2008.

Conclusion:
DCPP Security appears to have implemented all to-date NRC requirements, orders and regulations effectively. The DCISC should plan to review the implementation of the new DCPP Extensive Damage Management Guidelines and observe a Force-on-Force drill in 2008.

3.3 New Clearance Process eSOMS

The DCISC Fact-finding Team met with Matt Coward, DCPP Operations Planning Shift Manager, to review DCPP’s performance in Outage 1R14 on implementation of its new computer-based clearance process eSOMS (Electronic Shift Operations Manager System). The DCISC last reviewed eSOMS in April 2006 (Reference 6.3) when it concluded:

DCPP’s new clearance software, eSOMS (electronic Shift Operations Management System), appears to contain the necessary checks and balances for effective clearances and has the potential to reduce operator tagging burdens and errors. The DCISC should review eSOMS implementation in mid-2007.

The eSOMS program comprises an interrelated group of modules centered on an equipment database. The database will mirror that in NEXIS and be synchronized periodically. The eSOMS program contains the following sub-programs:

DCPP had implemented the first four parts related to clearance and tagging. The eSOMS Program utilizes tag sharing to minimize duplicate tags on components. Each unit will have its own outage and non-outage tagout every fuel cycle. Work will be assigned to a “section” of the tagout. Archived clearances from PIMS (the existing Plant Information Management System) will be available in eSOMS for copying, and eSOMS can be configured to facilitate special procedural requirements such as different independent verification types (i.e., concurrent, non-concurrent, etc.). DCPP is retaining its equipment out-of-service risk determination software (currently ORAM-Sentinel but moving to Safety Monitor) which will interface with eSOMS.

DCPP believes eSOMS will reduce the clearance/tagging burden on Operations by 20%. It should also reduce human errors in tagging.

DCPP’s clearance experience during Outage 1R14, the first outage application of eSOMS, was good, and the benefits of the new process were realized, i.e., clearance process simplification and fewer errors. Operations experienced its best human performance outage in 1R14 even with the large scope of work in containment, due in part to eSOMS.

Conclusion:
DCPP had good results using its new clearance process eSOMS. The new process provides improved clearance control and a more simplified overall process.

3.4 Meeting with the NRC Resident and Senior Resident Inspectors

The DCISC Fact-finding Team met with Michael Peck, NRC Senior Resident Inspector, and Tony Brown, Resident Inspector, for a DCPP regulatory and compliance update. The DCISC last met with the former NRC Senior Resident at the March 21-22, 2007 Fact-finding Meeting (Reference 6.4) when it concluded:

In meeting with the DCISC, the DCPP Senior Resident Inspector had no new concerns of significance to report. He had seen positive changes in the DCPP culture with the new management team.

Both Resident Inspectors were fairly new at DCPP: Mr. Brown had been at DCPP about 1-½ years and Mr. Peck since September 2007. Mr. Peck’s initial impressions of DCPP were as follows:

The inspectors had developed a database “Diablo Canyon Resident Inspector Issues List,” and the Fact-finding Team reviewed the Fourth Quarter 2007 version. Items were categorized as follows:

There were 24 Yellow and 5 Orange items, and none of other colors. The more significant of the Yellow and Orange items were as follows:

Conclusion:
The two NRC Resident Inspectors, although fairly new to DCPP, had quickly identified key issues, many of which the DCISC has been monitoring. Both Residents appeared knowledgeable of nuclear power plants and appropriately intrusive and challenging in monitoring regulatory issues.

3.5 Observe Nuclear Safety Oversight Committee (NSOC) Meeting

The DCISC Fact-finding Team attended and observed the January 18, 2008 DCPP NSOC meeting. The DCISC monitors NSOC meetings at least annually and last observed an NSOC meeting at its June 28-29, 2007 Fact-finding Meeting (Reference 6.5) when it concluded:

DCPP Nuclear Safety Oversight Committee (NSOC) meetings are satisfactory and continue to improve. All of the four external members were present. The Committee reviewed previous action plans that were not completed and new meeting action item to assure clarity, understanding, schedule, and responsibility. Agenda items were pertinent to nuclear and personnel safety. There was good attendance and participation by both DCPP and external members was strong with effective questioning and three-way communication. The External Members were very effective in asking questions and making comments. The NSOC sub-committee system and reports works well, but the DCISC Fact-finding Team did not observe identification of action plans to address concerns or problems identified in the Subcommittee Reports. The DCISC should continue attending about two NSOC Meetings each year.

The agenda for the NSOC meeting is included as Attachment 1.

The NSOC has undergone the following changes effective with this meeting:

NSOC focus includes Safety (nuclear, radiological, industrial, and environmental), Excellence, and Physical Security and issues which affect them. NSOC suggestions/recommendations will be raised and followed up by the four subcommittees. The Committee continues with its four subcommittees: Operations/Production, Maintenance, Engineering, and Organizational Effectiveness.

These changes and focus (and corresponding new charter) were discussed and agreed-upon.

Top Three QV “Insights”

Cary Harbor, Director of Quality Verification (QV), presented the following as the Top Three QV “Insights.” The “Insights” were targeted to identify gaps to excellence and were based on audit results, field and meeting observations, Corrective Action Program (CAP) and trend reviews, assessment results, quality control inspection results, and review of engineering products:

  1. Supplemental (contract) personnel oversight – examples include inappropriate rigging, violation of confined space requirements, trenching activities damaging cables, and relatively high injury rate. Individual corrective actions have been initiated, but QV has requested comprehensive analysis and actions.
  2. Industrial safety – examples include Red (not satisfactory) safety performance indicators, recordable injury rate in bottom industry quartile, 15 injuries in this period, and contractor injury rate in 4th quartile. Actions include a nonconformance report and cause analysis on Outage 1R14 injuries, Breakthrough Team efforts including training, and implementation of a contractor safety program. Results are being seen, and QV will continue to monitor.
  3. Reinforcement of Maintenance Standards – examples include inadequate Foreign Material Exclusion (FME) barriers, insufficient implementation of safety standards, and unsatisfactory work documentation. Actions taken are Maintenance Director required focus on in-field management observations, a new Maintenance Standards document, and training on human performance standards and coaching. QV considers this a long-standing item, believes more focus is needed on coaching observers and strong paired observations, and requested a response from Maintenance.

The NSOC discussion centered on trying to understand the insights, their causes and corrective actions. There was no NSOC action taken on the item. This appeared appropriate.

Plant Performance

Jim Becker, Vice-President Diablo Canyon Operations and Station Director, presented the overall plant performance since the last NSOC meeting in June 2007. The performance indicators were generally positive. There was considerable discussion on contractor personnel injuries and how to reduce them further.

Subcommittee Reports

The following subcommittee reports were discussed as information with the intention of having the subcommittees themselves acting and reporting back to NSOC on identified performance gaps.

Maintenance Subcommittee Report

Mike Wright, Interim Director of Maintenance Services, presented the following gaps to excellence from a QV audit of Maintenance Services:

The welder qualification gap was identified as the most important of the group because welding is critical to successful operation of the plant as well as in the upcoming Outage 2R14 which includes major projects with much welding activity. Maintenance has taken significant actions to obtain and certify qualified welders.

Engineering Subcommittee

External Member Jack Martin presented this report and reviewed the following:

Organizational Effectiveness Subcommittee

External Member Ed Hux presented this report covering the following items:

Operations Subcommittee

External Member and NSOC Chair Darrell Eisenhut gave this report on the following results of interviews with DCPP operators:

There were no nuclear safety concerns raised at the meeting.

Conclusion:
Changes to streamline and focus the Nuclear Safety Oversight Committee (NSOC) appear to have potential to improve its effectiveness. The January 18, 2008 NSOC meeting was facilitated effectively and focused in on the key issues. The use of subcommittees to raise and follow issues is a positive step.

3.6 DCISC Member Meeting with DCPP Management

DCISC Member Bill Conway met separately with Jim Becker, Vice-President Diablo Canyon Operations & Station Manager, to discuss items reviewed in this Fact-finding meeting and other items of interest to the Committee.

4.0 Conclusions

4.1
DCPP Security appears to have implemented all to-date NRC requirements, orders and regulations effectively. The DCISC should plan to review the implementation of the new DCPP Extensive Damage Management Guidelines and observe a Force-on-Force drill in 2008.
4.2
DCPP had good results using its new clearance process eSOMS. The new process provides improved clearance control and a more simplified overall process.
4.3
The two NRC Resident Inspectors, although fairly new to DCPP, had quickly identified key issues, many of which the DCISC has been monitoring. Both Residents appeared knowledgeable of nuclear power plants and appropriately intrusive and challenging in monitoring regulatory issues.
4.4
Changes to streamline and focus the Nuclear Safety Oversight Committee (NSOC) appear to have potential to improve its effectiveness. The January 18, 2008 NSOC meeting was facilitated effectively and focused in on the key issues. The use of subcommittees to raise and follow issues is a positive step.
5.0 Recommendations:
None

6.0 References

6.1
“Diablo Canyon Independent Safety Committee Seventeenth Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations, July 1, 2006 – June 30, 2007”, Approved October 24, 2007, Volume II, Exhibit D.9, Sections 3.2, “DCPP response and Implementation to NRC Security Issue B.5.b,” and 3.3, “Security Update.”
6.2
Ibid., Exhibit B.9, “Update on Security Changes Since the February 1, 2007 DCISC Public Meeting.”
6.3
“Diablo Canyon Independent Safety Committee Sixteenth Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations, July 1, 2005 – June 30, 2006”, Approved October 18, 2006, Volume II, Exhibit D.7, Section 3.7, “Clearance Process.”
6.4
“Diablo Canyon Independent Safety Committee Seventeenth Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations, July 1, 2006 – June 30, 2007”, Approved October 24, 2007, Volume II, Exhibit D7., Section 3.11, “Meet with NRC Senior Resident Inspector.”
6.5
“Diablo Canyon Independent Safety Committee Eighteenth Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations, July 1, 2007 – June 30, 2008”, Approved October 7, 2008, Volume II, Exhibit D.1, Section 3.7, “Observe Nuclear Safety Oversight Meeting.”

Nuclear Safety Oversight Committee (NSOC) Agenda (Attachment 1)

January 18, 2008 Diablo Canyon - 104/6/604 Thursday, January 17, 2008 - 6:30 pm DINNER @ Koberl at Blue in San Luis Obispo (Officers/Outside Members)

Friday, January 18, 2008 Administration Building, Conference Room 604

Nuclear Safety Over sigh Committee (NSOC0 Agenda
Tab Time Topic Presenter
1 730 Overview of Committee Structure Changes Keenan/Conway
2 750 ID any significant observations or focus issues for discussion by outside members Darrell Eisenhut
3 820 Review Action Items from 08/24/07 Meeting Darrell Eisenhut
4 830 Top 3 overall QV “insights” Cary Harbor
5 900 Plant Performance Summary, including ODMI issues and MSPI Performance Jim Becker
950 Break
6 1000 Operations/Production Subcommittee Darrell Eisenhut
7 1100 Maintenance Subcommittee Dhiaa Jamil
1200 Lunch
8 1230 Engineering Subcommittee Jack Martin
9 1330 Organizational Subcommittee Ed Hux
1430 Plus/Delta
1440 Executive Session for NSOC Members NSOC Members
1500 Adjourn

For more information about DCISC contact:

Diablo Canyon Independent Safety Committee