Acronyms used at Diablo Canyon Nuclear Power Plant (DCPP)

The following alphabetical listing contains abbreviations, acronyms, compound words, technical symbols, and spelling preferred for licensing and other regulatory correspondence.

A | B | C | D | E | F | G | H | I | J,K | L | M | N | O | P,Q | R | S | T | U,V | W,X,Y,Z


OSHAOccupational Safety and Health Administration
oceanside
offgas
AEODOffice for the Analysis and Evaluation of Operational Data (NRC)
OES (also ES)Office of Emergency Services (State)
OIE or IEOffice of Inspection and Enforcement (State)
IGOffice of Inspector General (NRC)
NMSSOffice of Nuclear Material Safety and Safeguards (NRC)
off-line (adj), off line (adv)
offshore
offsite
andOmega;ohm
OCBoil circuit breaker
OWSoil-water separator
one-dimensional
one-half
ongoing
on-line (adj), on line (adv)
onshore
onsite
ODESOnsite Dosimetry and Environmental Services
OMMSOnsite Meteorological Monitoring System
OTSCOnsite Technical Support Center
OTSCon-the-spot-change
OEoperability evaluation
OBAoperating basis accident
OBEoperating basis earthquake
OBIoperating basis incident
OEAoperating experience assessment
OLoperating license
OPoperating procedure
OVIDoperating valve identification diagram
ORATOperational Readiness Assessment Team (NRC)
OSCOperational Support Center
O&Moperations and maintenance
OOSout of service
ODoutside diameter
ODSCCoutside diameter stress corrosion cracking
overcurrent
overemphasize
overpower
overpressurization
oversized
OPCoverspeed protection control
overtemperature
overvoltage

For more information about DCISC contact:

Diablo Canyon Independent Safety Committee
Office of the Legal Counsel
857 Cass Street, Suite D, Monterey, California 93940
Telephone: in Califonia call 800-439-4688; outside of California call 831-647-1044
Send E-mail to: dcsafety@dcisc.org