Acronyms used at Diablo Canyon Nuclear Power Plant (DCPP)

The following alphabetical listing contains abbreviations, acronyms, compound words, technical symbols, and spelling preferred for licensing and other regulatory correspondence.

A | B | C | D | E | F | G | H | I | J,K | L | M | N | O | P,Q | R | S | T | U,V | W,X,Y,Z


p (pp)page(s)
PID
partial initial decision
PTparticle testing
ppbparts per billion
ppmparts per million
part-time (adj), part time (adv)
Papascal
pathway
PCTpeak cladding temperature
PGApeak ground acceleration
PGVpeak ground velocity
PTpenetrant test (dye)
%percent
PIPPerformance Incentive Plan
PIperformance indicator
PRPPerformance Recognition Program
PERSpersonnel exposure records system
PSERPhysical Security Event Report
PSPPhysical Security Plan
ppico- (10-12) (prefix)
pCipicocurie
pFpicofarad
piperack
pipeway
P&IDpiping and instrumentation diagram (drawing)
P&ISpiping and instrument schematic
PIMSPlant Information Management System
PIMPlant Issues Matrix (NRC)
PLEXplant life extension
PPRplant performance review (NRC)
PPTplant performance template (NRC)
PPCplant process computer
PPSplant protection system
PSRCPlant Staff Review Committee
plant-specific
PVCpolyvinyl chloride
PCDpopulation center distance
PDPpositive displacement pump
p.m.post meridiem (after noon)
post-accident
PAMpost-accident monitoring
PASSpost-accident sampling system
post-LOCA
PMTpost-maintenance test
post-operational
PSDARPost-Shutdown Decommissioning Activities Report
post-tensioned
PWHTpost-weld heat treatment
PEpotential energy
lbpound(s)
psipounds per square inch
psiapounds per square inch, absolute
psidpounds per square inch, differential
psigpounds per square inch, gage
power block
PCBpower circuit breaker
PFpower factor
PRpower range
PRNIpower range nuclear instrument
power-operated
PORVpower(pressure)-operated relief valve
preaccident
preamplifier
pre-award
prefabprefabricated
prefilter
preinspect
prejob
PSARPreliminary Safety Analysis Report
preoperational
prepressurization
PSIpreservice inspection
preset
PNACPresident’s Nuclear Advisory Committee
mm Hgpressure (millimeter of mercury)
PTLRpressure and temperature limits report
PIpressure indicator
PSpressure switch
PTpressure transmitter
PVRCPressure Vessel Research Committee
PTSpressurized thermal shock
PWRpressurized water reactor
PRTpressurizer relief tank
PSRVpressurizer safety relief valve
PMpreventive maintenance
PWSCCprimary water stress corrosion cracking
PRAprobabilistic risk assessment
PODprobability of detection
POPCDprobability of prior cycle detection
peprobable error
PMFprobable maximum flood
PMPprobable maximum precipitation
procedure (capitalize when specific)
PCDprocedure commitment database
PCPProcess Control Program
PDProgram Directive
POAprompt operability assessment
PABprotected area boundary
PAGProtective Action Guide (exposure limits)
PASpublic address system
PDRPublic Document Room
PSDPublic Staff Division (of CPUC)
PUCPublic Utilities Commission
pumpdown
punchlist
POpurchase order
Q-List (classification listing of structures, systems, and components)
QPTRquadrant power tilt ratio
QTDquadrant tilt difference
QBLqualified bidders list
QSLqualified suppliers list
QAquality assurance (when used generically)
QAPRQuality Assurance Problem Report
QAPquality assurance procedure
QAFquality audit finding
QCquality control (when used generically)
QEQuality Evaluation
Quality Hotline
QPARQuality Performance Assessment Report
QPRQuality Problem Report
QPSRQuality Problem Status Report

For more information about DCISC contact:

Diablo Canyon Independent Safety Committee
Office of the Legal Counsel
857 Cass Street, Suite D, Monterey, California 93940
Telephone: in Califonia call 800-439-4688; outside of California call 831-647-1044
Send E-mail to: dcsafety@dcisc.org